Duty Engineer 值班工程师
- 中国
- 长期
- 全职
- Participates in the preparation of the annual POMEC Budget.
- 参与制定年度POMEC预算
- Reviews proposed capital expenditure authorization requests forms pertaining to POMEC, and makes appropriate recommendations.
- 审核与POMEC相关的资本支出授权申请表提议,并提供适当的推荐。
- In case of pre-opening hotels assist Director of Engineer for all the engineering related jobs as describe in pre-opening engineering check list, but not limited to.
- 如果是筹开酒店,协助工程总监履行筹开工程清单中列出的所有工程相关职责,但不仅限于这份清单。
- Reports daily by log book to the Director of Engineer of all irregularities during his shift and steps taken to rectify the problems highlighted.
- 通过日志薄向工程总监每日汇报当班期间所有非常规事件以及纠正问题所采取的行动。
- Determines optimal operating efficiencies and take necessary corrective measures when variance from standards are excessive through logs and utility data
- 决定最优的操作效率,并在日志和公共设施数据显示与标准差异过大时采取必要的改善措施
- Attends to all types of repair and maintenance work in the Hotel premises including any new additions / extensions to the Hotel or any other properties maintained by the Hotel.
- 参加酒店范围内的各类维修和保养工作,包括酒店的新增和延伸设施或由酒店提供维修保养的任何其他物业。
- Advises improvements to the present system in order to optimize the operating efficiency and economy of the said system.
- 对现有的系统提出改进建议,从而优化该系统的运作效率和经济节约。
- Coordinates and attends/distributes all work orders directly to his staff for action on a daily basis, giving priority to guest complaints.
- 每天协调并参加/向员工直接分配实施所有的工作定单,优先处理客人投诉。
- Prepare engineering department required spare parts list.
- 准备工程部必要零部件清单。
- Prepares PM annual plan and a monthly Maintenance Status Report.
- 准备项目管理年度计划和每月的维修情况报告。
- Ensures that the water treatment and water treatment testing is being carried on
- 确保实施水处理和水处理检测
- Ensures implementation of IHG policies and procedures for:
- 确保在以下方面实施IHG政策和程序:
- Maintenance schedules.
- Supports and initiate programs for the improvement procedures and the reduction of energy and utility costs.
- 支持和发起降低能源及公共设施成本和流程改进的计划
- Analyses and monitors energy costs and expenditures for the department.
- 分析和监督本部门的能源成本和支出
- Recommends to the Director of Engineer, new policies and procedures for a more economical operation and maintenance program.
- 向工程总监推荐新的政策和程序,制定更经济的运作和维修保养计划
- Prepares PM work orders and follows up work orders on a daily basis. Advisees the Director of Engineer on any problems or delays.
- 每天准备项目管理工作定单并跟进工作定单。将任何问题或延迟告知工程总监。
- Follow up on work request and PM backlogs twice a week and is responsible for completion and correct closing of all work requests. At the end of the week he presents a status report.
- 每周两次跟进工作请求和项目管理待办事务,负责所有工作请求的完成和正确结束。在每周结束时提交工作进度报告。
- Provides a weekly report of any plant or equipment witch is Out Of Order and the action taken.
- 提供发生故障的机房或设备的周报告以及采取的行动。
- Supervises outside contractor when working on plants or equipment in order to ensure high standards of workmanship.
- 监督外部承包商对机房或设备的相关工作,以确保高标准的工艺水平。